Cost per Enplaned Passenger (CPE)

Actual CPE from FAA CATS filings and projected CPE from airport Official Statements.

Cost per enplanement (CPE) is the most widely cited metric for comparing airline operating costs across U.S. airports — total airline payments (landing fees, terminal rents, and other charges) divided by enplaned passengers. Values range from under $5 at cost-efficient large hubs to over $40 at airports with major capital programs. See our full CPE analysis.

CPE Data — Large Hub

Bold = Actual (FAA CATS) · Italic = Projected (Official Statement)

#AirportEnpaxFY 2024FY 2025FY 2026FY 2027FY 2028FY 2029FY 2030FY 2031FY 2032FY 2033FY 2034FY 2035Source
1ATL52,511k$3.93$4.48$9.54$11.45$13.49$14.65$15.28'25AB OS, all-in CPE
2DFW42,351k$13.44$13.86$16.99$20.26$23.11$25.46$25.88'25AB OS
3DEN40,013k$12.76FAA CATS
4ORD38,576k$29.56$29.52$29.85$30.67$31.91$36.56$37.68$37.65$36.42$40.97$46.82$45.82'25AB OS
5LAX37,761k$30.16$33.85$38.10$42.85$46.41$50.64$51.82$55.88$57.39$58.88$60.72'25ABC OS
6JFK31,466k$36.01FAA CATS
7CLT28,524k$4.74$6.46$5.06$5.34$5.94$7.16$7.47$8.32$9.60'25AB OS
8LAS28,245k$5.36$7.13$8.66'25A OS
9MCO27,860k$8.18$12.56$13.84$15.19$15.65'24 OS
10MIA26,588k$16.83$17.62$19.60$21.87$24.48$26.28$28.81$30.62'25ABC OS
11PHX25,596k$7.81$8.62FY2025 FAA CATS
12SEA25,415k$18.24$19.43$22.51$25.60$27.53$29.07$30.84'25ABC OS
13SFO25,079k$32.14$28.11$24.57$28.43$35.51$41.60$46.01'25DE OS
14EWR24,544k$31.67FAA CATS
15IAH23,349k$10.66$11.17$12.93$12.71$11.95$13.31$13.24$13.21$13.21'25AB OS
16BOS21,091k$21.72$23.50FY2025 FAA CATS
17MSP18,054k$11.06$9.89$10.27$12.02$12.22$12.24$13.26'24AB OS
18FLL17,096k$10.20FAA CATS
19LGA16,716k$23.20FAA CATS
20DTW16,111k$8.88$12.61$13.22$13.55$13.63$13.08$13.12$13.19'25DEFGH OS
21PHL15,102k$15.03$16.33$16.39$18.43$17.80$15.15$16.37$17.62'25AB OS
22SLC13,544k$10.44$19.25$21.36$23.10$23.78$23.63$23.37$23.20'25AB OS
23BWI13,221k$10.57$11.57$11.61$12.37$12.63'24A OS
24IAD13,003k$12.88$9.51$12.57$15.86$16.51$17.43$20.71'25A MWAA OS
25SAN12,780k$17.35$18.52$20.85$21.86$25.24$26.78$28.54$29.43'25AB OS
26DCA12,751k$7.73$8.38$10.74$11.23$13.87$15.65$16.60'25A MWAA OS
27TPA12,076k$10.22$12.85$13.57$17.92$19.58$21.44'24AB OS
28BNA12,059k$8.49$9.41$10.91$11.39$12.55$15.83$17.48$17.11$16.73'25 OS
29AUS10,678k$13.54$16.08CLEARED
30HNL10,449k$20.92$21.57$17.97$19.49$22.34$25.37$26.56$27.25'25ABCD HAW OS
31MDW10,360k$15.59$27.82$27.90$28.09$29.45$28.01$30.09'25AB OS

FY 2024 CPE — Large Hub

Colored = Actual (FAA CATS) · Gray = Projected (OS) · Dashed line = weighted average

Loading chart…

Sources: FAA CATS FY2024 (actual CPE) · Airport Official Statements (projected CPE) · Hub classification: FAA CY 2024 Enplanement Data · Prepared by DWU Consulting

Actual vs. Projected CPE

Actual CPE comes from FAA CATS (Compliance Activity Tracking System) — realized airline costs reported annually. Projected CPE comes from airport Official Statements (OS) associated with bond issuances — consultant forecasts under assumed traffic scenarios. A CPE spike during a capital program peak followed by a decline as debt amortizes signals a different credit profile than persistently high CPE.

Related: Rate Methodologies · Airport KPIs · Airline Rates · Monthly Traffic

Related Articles